PM okays proposal of hiring consulting units for HCM City Metro line 5

Created 16 May 2018
  • PDF
Editor Choice
Share
(0 votes, average 0 out of 5)
Prime Minister Nguyen Xuan Phuc has approved a proposal to hire foreign consulting units or domestic and foreign joint ventures to verify the pre-feasibility study report of the Ho Chi Minh City metro line 5 project.

PM okays proposal of hiring consulting units for HCM City Metro line 5, social news, vietnamnet bridge, english news, Vietnam news, news Vietnam, vietnamnet news, Vietnam net news, Vietnam latest news, vn news, Vietnam breaking news

PM okays proposal of hiring consulting units for HCM City Metro line 5, social news, vietnamnet bridge, english news, Vietnam news, news Vietnam, vietnamnet news, Vietnam net news, Vietnam latest news, vn news, Vietnam breaking news

Ho Chi Minh City metro project map (Source: baoxaydung.com.vn)

The PM assigned the Minister of Planning and Investment as the Chairman of the State verification council to select the consulting unit, while gathering ideas of other ministries to maximise the effectiveness and economise the hiring.

The Metro line 5, spanning from the new Can Giuoc coach station to Sai Gon bridge, has a total length of 26 kilometres.

In the first phase, an 8.9km section will be built from Bay Hien crossroad in Tan Binh district to Sai Gon bridge. 

The line has a total investment of 1.562 billion EUR and an implementation time from 2009 to 2027.

Under its design, the Metro line 5 will connect with line 2 at Bay Hien crossroad, line 4 at Phu Nhuan crossroad in Phu Nhuan district, Tan Son Nhat airport terminal in Tan Binh district, line 3b at Hang Xanh station in Binh Thanh district and line 1 at Sai Gon bridge station in Binh Thanh district.

HCM City’s metro project was the first proposed in 2001 as part of a comprehensive public transport plan for the city and neighbouring provinces to tackle traffic congestion.

It includes three monorail lines with a total length of 37km and six partly underground metro routes running a total of 107km from Ben Thanh to Suoi Tien, Ben Thanh to Tham Luong, Ben Thanh to Binh Tan, Lang Cha Ca to Van Thanh, Thu Thiem to Can Giuoc and Ba Queo – Phu Lam. Ben Thanh will be a hub connecting all the lines.

According to initial estimates in 2007, total investment of the project was 17 trillion VND (about 749 million USD). However, a recent calculation of Japanese consultant joint venture, verified by a Singaporean independent consultant unit, showed the total cost will be 47 trillion VND (2.07 billion USD). So far, 51 percent of the project’s workload has been completed and the project is scheduled to be finished in 2020.-

 

Source: VNA - Bridge

Maybe You Also Interesting :

» Two bodies found after Dong Nai River barge accident

The bodies of two people who were tossed overboard after a barge capsized on the Dong Nai River were found after an eight-hour search. One other person is...

» Ministry to ensure adequate meningococcal vaccine in 2018

At least 100,000 doses of the meningococcal vaccine will be imported to Viet Nam by the end of May, increasing the number of imported doses to some 800,000 in...

» Hanoi needs investment in static traffic infrastructure

Experts and businesses said the capital city has been leading the country in attracting investment for traffic-related infrastructure, said Economic and Urban...

Popular News Categories:

- Asia & Asean  |  EU & Russia  |  America

- Facts  |  Urban  |  Faculty  |  Environment

- Business  |  Finance  |  Market Health

- Destination  |  Cuisine  |  Arts Music

- Cinema  |  Soccer  |  Sports  |  IT & Internet